BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Co-Trimoxazole: stated expected-back windows (ShortageSignal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Co-Trimoxazole\, as stated by the source\; each end is derived fr
 om the phrase (the stated day where one was given\; six days after a state
 d week-commencing day\; otherwise the 10th for early\, the 20th for mid\, 
 the last day of the month for late or a bare month) and each event says wh
 ich rule applied. Checked twice daily by scheduled jobs (not live). A wind
 ow ending says nothing about stock at your wholesaler. Not clinical advice
 .
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2023-103@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20240320
DTEND;VALUE=DATE:20240321
SUMMARY:MSN/2023/103: stated expected-back window ends ("mid-March 2024")
DESCRIPTION:As stated: "mid-March 2024". Window end derived from that phras
 e as the 20th of the stated month\, the end this record uses for "mid"\; t
 he source gives no day (20 Mar 2024). This is an observation about the rec
 ord\, not about supply.\nNotice: https://shortagesignal.co.uk/notice/msn-2
 023-103\nSource: https://cpe.org.uk/our-news/medicine-supply-notification-
 co-trimoxazole-40mg-200mg-5ml-oral-suspension-sugar-free
URL:https://shortagesignal.co.uk/notice/msn-2023-103
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expected-msn-2024-068@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20240910
DTEND;VALUE=DATE:20240911
SUMMARY:MSN/2024/068: stated expected-back window ends ("early September 20
 24")
DESCRIPTION:As stated: "early September 2024". Window end derived from that
  phrase as the 10th of the stated month\, the end this record uses for "ea
 rly"\; the source gives no day (10 Sep 2024). This is an observation about
  the record\, not about supply.\nNotice: https://shortagesignal.co.uk/noti
 ce/msn-2024-068\nSource: https://cpe.org.uk/our-news/medicine-supply-notif
 ication-co-trimoxazole-40mg-200mg-5ml-oral-suspension-sugar-free-2
URL:https://shortagesignal.co.uk/notice/msn-2024-068
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expected-msn-2026-016@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20260630
DTEND;VALUE=DATE:20260701
SUMMARY:MSN/2026/016: stated expected-back window ends ("June 2026")
DESCRIPTION:As stated: "June 2026". Window end derived from that phrase as 
 the last day of the stated month\; the source gives no day (30 Jun 2026). 
 This is an observation about the record\, not about supply.\nNotice: https
 ://shortagesignal.co.uk/notice/msn-2026-016\nSource: https://cpe.org.uk/ou
 r-news/medicine-supply-notification-co-trimoxazole-40mg-200mg-5ml-oral-sus
 pension-sugar-free-and-co-trimoxazole-80mg-400mg-5ml-oral-suspension
URL:https://shortagesignal.co.uk/notice/msn-2026-016
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
