BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Creon Micro Pancreatin: stated expected-back windows (Shortage
 Signal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Creon Micro Pancreatin\, as stated by the source\; each end is de
 rived from the phrase (the stated day where one was given\; six days after
  a stated week-commencing day\; otherwise the 10th for early\, the 20th fo
 r mid\, the last day of the month for late or a bare month) and each event
  says which rule applied. Checked twice daily by scheduled jobs (not live)
 . A window ending says nothing about stock at your wholesaler. Not clinica
 l advice.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2024-089@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20240930
DTEND;VALUE=DATE:20241001
SUMMARY:MSN/2024/089: stated expected-back window ends ("late September 202
 4")
DESCRIPTION:As stated: "late September 2024". Window end derived from that 
 phrase as the last day of the stated month\; the source gives no day (30 S
 ep 2024). This is an observation about the record\, not about supply.\nNot
 ice: https://shortagesignal.co.uk/notice/msn-2024-089\nSource: https://cpe
 .org.uk/our-news/medicine-supply-notification-creon-micro-pancreatin-60-12
 mg-gastro-resistant-granules
URL:https://shortagesignal.co.uk/notice/msn-2024-089
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
