BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Gentisone Hc: stated expected-back windows (ShortageSignal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Gentisone Hc\, as stated by the source\; each end is derived from
  the phrase (the stated day where one was given\; six days after a stated 
 week-commencing day\; otherwise the 10th for early\, the 20th for mid\, th
 e last day of the month for late or a bare month) and each event says whic
 h rule applied. Checked twice daily by scheduled jobs (not live). A window
  ending says nothing about stock at your wholesaler. Not clinical advice.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2021-034@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20211031
DTEND;VALUE=DATE:20211101
SUMMARY:MSN/2021/034: stated expected-back window ends ("w/c 25th October 2
 021")
DESCRIPTION:As stated: "w/c 25th October 2021". Window end derived from tha
 t phrase as six days after the week-commencing day the source stated (31 O
 ct 2021). This is an observation about the record\, not about supply.\nNot
 ice: https://shortagesignal.co.uk/notice/msn-2021-034\nSource: https://cpe
 .org.uk/our-news/medicine-supply-notification-gentisone-hc-gentamicin-0-3-
 w-v-and-hydrocortisone-acetate-1-w-v-ear-drops
URL:https://shortagesignal.co.uk/notice/msn-2021-034
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
