BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Latanoprost: stated expected-back windows (ShortageSignal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Latanoprost\, as stated by the source\; each end is derived from 
 the phrase (the stated day where one was given\; six days after a stated w
 eek-commencing day\; otherwise the 10th for early\, the 20th for mid\, the
  last day of the month for late or a bare month) and each event says which
  rule applied. Checked twice daily by scheduled jobs (not live). A window 
 ending says nothing about stock at your wholesaler. Not clinical advice.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2023-023@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20230317
DTEND;VALUE=DATE:20230318
SUMMARY:MSN/2023/023: stated expected-back window ends ("17th March 2023")
DESCRIPTION:As stated: "17th March 2023". Window end derived from that phra
 se as the day the source stated (17 Mar 2023). This is an observation abou
 t the record\, not about supply.\nNotice: https://shortagesignal.co.uk/not
 ice/msn-2023-023\nSource: https://cpe.org.uk/our-news/medicine-supply-noti
 fication-latanoprost-monopost-50-microgram-ml-eye-drops-0-2-ml-unit-dose-p
 reservative-free
URL:https://shortagesignal.co.uk/notice/msn-2023-023
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expected-msn-2025-069@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20260210
DTEND;VALUE=DATE:20260211
SUMMARY:MSN/2025/069: stated expected-back window ends ("early February 202
 6")
DESCRIPTION:As stated: "early February 2026". Window end derived from that 
 phrase as the 10th of the stated month\, the end this record uses for "ear
 ly"\; the source gives no day (10 Feb 2026). This is an observation about 
 the record\, not about supply.\nNotice: https://shortagesignal.co.uk/notic
 e/msn-2025-069\nSource: https://cpe.org.uk/our-news/medicine-supply-notifi
 cation-latanoprost-50micrograms-ml-timolol-5mg-ml-fixapost-eye-drops-0-2ml
 -unit-dose-preservative-free
URL:https://shortagesignal.co.uk/notice/msn-2025-069
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:expected-msn-2026-031@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20260930
DTEND;VALUE=DATE:20261001
SUMMARY:MSN/2026/031: stated expected-back window ends ("September 2026")
DESCRIPTION:As stated: "September 2026". Window end derived from that phras
 e as the last day of the stated month\; the source gives no day (30 Sep 20
 26). This is an observation about the record\, not about supply.\nNotice: 
 https://shortagesignal.co.uk/notice/msn-2026-031\nSource: https://cpe.org.
 uk/our-news/medicine-supply-notification-latanoprost-50micrograms-ml-timol
 ol-5mg-ml-fixapost-eye-drops-0-2ml-unit-dose-preservative-free-2/
URL:https://shortagesignal.co.uk/notice/msn-2026-031
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
