BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Methylprednisolone Acetate: stated expected-back windows (Shor
 tageSignal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Methylprednisolone Acetate\, as stated by the source\; each end i
 s derived from the phrase (the stated day where one was given\; six days a
 fter a stated week-commencing day\; otherwise the 10th for early\, the 20t
 h for mid\, the last day of the month for late or a bare month) and each e
 vent says which rule applied. Checked twice daily by scheduled jobs (not l
 ive). A window ending says nothing about stock at your wholesaler. Not cli
 nical advice.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2021-068@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20220228
DTEND;VALUE=DATE:20220301
SUMMARY:MSN/2021/068: stated expected-back window ends ("late February 2022
 ")
DESCRIPTION:As stated: "late February 2022". Window end derived from that p
 hrase as the last day of the stated month\; the source gives no day (28 Fe
 b 2022). This is an observation about the record\, not about supply.\nNoti
 ce: https://shortagesignal.co.uk/notice/msn-2021-068\nSource: https://cpe.
 org.uk/our-news/medicine-supply-notification-methylprednisolone-acetate-de
 po-medrone-40mg-ml-vials-and-methylprednisolone-acetate-depo-medrone-with-
 lidocaine-1-40mg-ml-and-80mg-2ml-vials
URL:https://shortagesignal.co.uk/notice/msn-2021-068
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
