BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Somatropin: stated expected-back windows (ShortageSignal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Somatropin\, as stated by the source\; each end is derived from t
 he phrase (the stated day where one was given\; six days after a stated we
 ek-commencing day\; otherwise the 10th for early\, the 20th for mid\, the 
 last day of the month for late or a bare month) and each event says which 
 rule applied. Checked twice daily by scheduled jobs (not live). A window e
 nding says nothing about stock at your wholesaler. Not clinical advice.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2023-089@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20240218
DTEND;VALUE=DATE:20240219
SUMMARY:MSN/2023/089: stated expected-back window ends ("w/c 12th February 
 2024")
DESCRIPTION:As stated: "w/c 12th February 2024". Window end derived from th
 at phrase as six days after the week-commencing day the source stated (18 
 Feb 2024). This is an observation about the record\, not about supply.\nNo
 tice: https://shortagesignal.co.uk/notice/msn-2023-089\nSource: https://cp
 e.org.uk/our-news/medicine-supply-notification-somatropin-genotropin-miniq
 uick-1-4mg-1-6mg-and-1-8mg-powder-and-solvent-for-solution-for-injection-p
 re-filled-disposable-devices
URL:https://shortagesignal.co.uk/notice/msn-2023-089
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
