BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ShortageSignal//shortagesignal.co.uk//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Triptorelin Acetate: stated expected-back windows (ShortageSig
 nal)
X-WR-CALDESC:Ends of the expected-back windows stated on England supply not
 ices for Triptorelin Acetate\, as stated by the source\; each end is deriv
 ed from the phrase (the stated day where one was given\; six days after a 
 stated week-commencing day\; otherwise the 10th for early\, the 20th for m
 id\, the last day of the month for late or a bare month) and each event sa
 ys which rule applied. Checked twice daily by scheduled jobs (not live). A
  window ending says nothing about stock at your wholesaler. Not clinical a
 dvice.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:expected-msn-2025-007@shortagesignal.co.uk
DTSTAMP:20261020T205438Z
DTSTART;VALUE=DATE:20260110
DTEND;VALUE=DATE:20260111
SUMMARY:MSN/2025/007: stated expected-back window ends ("early January 2026
 ")
DESCRIPTION:As stated: "early January 2026". Window end derived from that p
 hrase as the 10th of the stated month\, the end this record uses for "earl
 y"\; the source gives no day (10 Jan 2026). This is an observation about t
 he record\, not about supply.\nNotice: https://shortagesignal.co.uk/notice
 /msn-2025-007\nSource: https://cpe.org.uk/our-news/medicine-supply-notific
 ation-triptorelin-acetate-gonapeptyl-depot-3-75mg-powder-and-solvent-for-s
 uspension-for-injection-pre-filled-syringes
URL:https://shortagesignal.co.uk/notice/msn-2025-007
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
